NEW FEE SCHEDULE EFFECTIVE APRIL 1, 2023

Effective April 1, 2023 all Development & Inspection Fee Schedules will be updated as shown below. Click here to download these updated fee schedules.
PERMIT | FEE SCHEDULE |
---|---|
New Homes: unheated sqft total and heated sqft total | (unheated sqft total multiplied by $22) + (heated sqft total multiplied by $90) = construction cost. Permit fee = $5.75 per $1,000 of construction cost |
Additions: unheated and heated sqft totals |
(unheated sqft total multiplied by $22) + Permit fee = $5.75 per $1,000 of construction cost Minimum fee: $200 |
Decks, Patios, Porches: based on construction cost and sqft |
Permit fee = $5.75 per $1,000 of construction cost Minimum fee: $100 |
Accessory Structure: Square footage total |
Permit fee = $5.75 per $1,000 of construction cost Minimum fee: $100 |
Renovations: contractor supplied construction cost ($5.75 per $1,000 of construction cost ) |
Permit fee = $5.75 per $1,000 of construction cost Minimum fee: $100 |
Basement Finish: sqft transitioning from unheated to heated |
(unheated to heated sqft total multiplied by $78) = Permit fee = $5.75 per $1,000 of construction cost |
Power Use Only (power reconnect) | $50 |
Subcontractor standalone permits (HVAC, Plumbing, Electric) |
Permit fee = $5.75 per $1,000 of construction cost Minimum fee: $50, based on subcontractor provided construction cost |
Pools: based on contractor supplied construction cost |
Permit fee = $5.75 per $1,000 of construction cost Minimum fee: $250 |
FEE TYPE | FEE SCHEDULE |
---|---|
Certificate of Occupancy (C/O) | $50 (New Homes Only) |
Renewal Fee | $100 |
Upload Fee | $15 |
Revision Fee | $50 |
TCO Fee | $500 (Valid for a maximum of 30 days) |
Reinspection Fee: | 1st: $50, 2nd: $75, 3rd: $100 and each subsequent time |
PERMIT | FEE SCHEDULE |
---|---|
New tenant/INT Remodel/Vacant Tenant: Contract agreement price |
Permit fee = $6.85 per $1,000 of calculated construction cost C/O Fee: $50 |
Shell building only: Commercial Building Valuation: 80% (per ICC) |
Permit fee = $6.85 per $1,000 of calculated construction cost LOC Fee: $50 |
Freestanding Building with Tenant: Commercial building valuation Actual tenant build-out above the valuation cost |
Permit fee = $6.85 per $1,000 of calculated construction cost C/O Fee: $50 |
Move-In |
Review fee: $100 C/O Fee: $50 |
Re-Roofs/Solar Panels: Review fee/contractor agreement price |
Permit fee = $6.85 per $1,000 of calculated construction cost LOC Fee: $50 |
Demo/Pools/Accessory Structure/Retaining Walls (Site Review): Contract agreement price |
Permit fee = $6.85 per $1,000 of calculated construction cost Site Plan Review Fee: $100 LOC Fee: $50 Historical Review: $50 (Demo Only) |
EV Charging Station: Contract agreement price |
Permit fee = $6.85 per $1,000 of calculated construction cost Site Plan Review Fee: $100 LOC Fee: $50 |
Cell Tower: Contract agreement price |
Permit fee= $6.85 per $1000 of calculated construction cost Land Use Review Fee: 50 |
Town Homes |
Permit fee= $6.85 per $1000 of calculated construction cost Site Plan Review Fee: $100 C/O Fee: $50 |
FEE TYPE | FEE SCHEDULE |
---|---|
Revision Fee | $150 |
Expedited Fee | $1,000, Approval required |
In-Person Preliminary Plan Review | $250 |
Site Plan Review Fee (Pools, Demo, Retaining Walls) | $100 |
Minimum Contractor Change Fee | $250, Affidavit required |
Land Use Review Fee (Pools, Cell Towers, EV Stations , ETC) | $50 - $100 |
Permit Renewal Fee | $250 |
Technology Fee | $15 |
FEE TYPE | FEE SCHEDULE |
---|---|
Single Family Residential |
$50 per lot (LDP*) ($250 minimum) $40 x disturbed acreage (NPDES**) |
Commercial/Townhomes & Condominiums |
$200 x disturbed acreage (LDP*) ($400 minimum) $40 x disturbed acreage (NPDES**) |
Minimum Permit Fee | $250 |
Site Plan Revisions |
$100 |
*Full fee charged for each type of LDP per project (ex: Clearing Only LDP, Grading Only LDP, Full Site LDP, etc.)
**NPDES fee only charged once per project and ONLY if project has OVER 1 ACRE of disturbance
FEE TYPE | FEE SCHEDULE |
---|---|
Plan Review Fee (Site Plan Review) | $250 per submittal for weekly plan review* |
Residential Plan Review Fee (Structural Plan Review) | $150 |
Expedited Plan Review Fee (Structural Plan Review) | $1,000 |
Plat Review Fee: Final Plat/Lot Split/Lot Combination/Merge | $150 |
Final Plat Revision | $75 (Review Fee) |
Technology Fee | $15 |
*Full fee charged for each type of LDP per project (ex: Clearing Only LDP, Grading Only LDP, Full Site LDP, etc.)