Back to top

CobbLinc Route 25 Detour: Effective 5/18 - 7/31

Image
Map of route 25 detour
May 12, 2020

Beginning May 18, 2020, South Gordon Road will be closed to thru traffic between Factory Shoals Road and Mableton Parkway to allow for a water main installation. This closure directly impacts Route 25 and will require vehicles to run a detour route.  As a result, the following stops will not be accessible and will be temporarily inactive:

  • inbound and outbound stops at S. Gordon Rd & Riverside Intermediate School
  • all stops (inbound & outbound) along Hillcrest Drive SE

In addition, a temporary outbound stop will be located on Six Flags Parkway at Hillcrest Drive SE.

These changes are anticipated to last through 7/31.